Projects

Delta Civil Engineering has undertaken a wide range of projects for a variety of clients.

Here are a few quick links to help you find the projects you are interested in:

Please find the details of all our projects below.

  • Oxford Grove Tank IlfracombeTo alleviate flooding at peak storm conditions a segmental concrete storage tank was constructed in a popular public car park. A tight 13 week programme of works was agreed in order to return the car park to public use for the beginning of the summer...Read More
    Oxford Grove Tank Ilfracombe
  • Terminal Pumping Station Necton NorfolkDelta were awarded the above project to upgrade the sewerage infrastructure on the Necton Estate to meet the adoptable standards set by Anglian Water. Read More
    Terminal Pumping Station Necton Norfolk
  • Stratford City Utility Installations (Olympics)The section of the Olympic’s site designated for the retail park development, sits within a triangle of Network Rail’s infrastructure. Delta were awarded the contract, to develop the final design and to submit and gain approval ...Read More
    Stratford City Utility Installations (Olympics)
  • Paddington LTVA ProjectThe advance works contact for the Paddington Long Term Vehicle Access consisted of diverting BT’s cables from within the to be demolished, Bishops Bridge road bridge, into a 190m long, 900mm diameter microtunnel beneath Network Rail’s...Read More
    Paddington LTVA Project
  • Portsmouth Transfer TunnelAn Iseki slurry machine system was used to install an 8m long x 1500 dia pipe jacked connection between a 6m dia storage shaft and a 10m dia pumping station shaft, both 30m deep, at the end of a 8km x 2.8m dia sewage transfer tunnel. Read More
    Portsmouth Transfer Tunnel
  • Thanet Road Tank Ramsgate KentIn order to improve the Bathing Water quality in the area, a number of schemes were proposed to remedy the situation in Ramsgate.Read More
    Thanet Road Tank Ramsgate Kent
  • 270kVCable Tunnel Diversion Sellindge KentThe route of the ‘Channel Tunnel Rail Link’ will sever the existing electricity supply route from France to the Sellindge converter station.Read More
    270kVCable Tunnel Diversion Sellindge Kent
  • Sherborne Landfill Site CulvertAn existing watercourse culvert situated below a closed landfill site was found to be structural unsound and Delta were awarded a contract to construct a 350m long x 1200mm dia pipejack in 3Nr drives on a route around the landfill siteRead More
    Sherborne Landfill Site Culvert
  • Sidmouth Storage Tank DevonAs part of the new sewerage system being installed in Sidmouth a storage tank, situated at the junction of the River Otter and the sea was required, to intercept the flows.Read More
    Sidmouth Storage Tank Devon
  • 132kVCable Tunnel Diversion SittingbourneAs part of the upgrading of the A249/A2 trunk road junction just north of Sittingbourne, Kent, Seeboard’s existing 132kV cables had to be diverted beneath the route of the new dual carriageway. Read More
    132kVCable Tunnel Diversion Sittingbourne