Copner Road Bridge Services Diversion

Client: Portsmouth City Council  / Edmund Nuttall
Project Value: £178,000
Scope:

To enable the bridge deck to be replaced the services within the existing structure had to be diverted below Network Rails operating infrastructure as an advance works package. Using our PBA85 Guided Auger system 6Nr 300mm clayware ducts, each 40m long, were installed from a single 6m long x 3m wide x 3.5m deep drive pit into a 6m long x 2.5m wide x 3.3m deep reception pit as temporary works. The UTX’s were completed in 5 weeks and Delta extended each duct for Gas, Water, Electricity, Cable TV and BT services beyond both pits to 1m below ground level. To complete the work the works we removed all sheets and frames and in filled both pits leaving the concrete base in place. Delta responsibilities also included Form B design submission.

Copner Road Bridge Services Diversion

Copner Road Bridge Services Diversion

Copner Road Bridge Services Diversion

Similar Projects

‹ Back

Enquire Now

If you have a question about Copner Road Bridge Services Diversion or anything related to this, please contact us, alternatively fill in the form below and we'll get back to you as soon as possible.