Souldern Viaducts Renovation

Client: Railtrack / Birse rail
Project Value: £700,000
Scope:

The structural condition of two viaducts (18 & 25 span) were improved by the installation of 48no spandrell ties, plus pinning and grouting, stitching, replacement of defective brickwork beneath arches plus the introduction of new ductile iron down pipes and connections to improve the track drainage.

The works were in association with the ‘Evergreen Project’ which was a major upgrading of  the Bicester branch line to increase the speed limits along this stretch.

The complete works was carried out during a short nine week day time programme without possessions.