Micro Tunnelling Projects in Hampshire

Delta Civil Engineering has undertaken a wide range of Micro Tunnelling Projects.

Please find details of these below.

  • Portsmouth Transfer TunnelAn Iseki slurry machine system was used to install an 8m long x 1500 dia pipe jacked connection between a 6m dia storage shaft and a 10m dia pumping station shaft, both 30m deep, at the end of a 8km x 2.8m dia sewage transfer tunnel. Read More
    Portsmouth Transfer Tunnel